Manufacturing & Quality Overview

 

Huizhou Qiangfeng Power Technology Co., Ltd. integrates manufacturing, process control and product verification within its production operations for battery chargers and power electronics.

 

The manufacturing process covers electronic assembly, power module assembly, complete-unit production, testing and final inspection. Quality controls are applied at key stages from incoming materials through finished-product verification.

 

This manufacturing and quality structure supports production according to defined product and project requirements.

 

Controlled Manufacturing Process

Production follows a defined sequence from PCB assembly to finished-product inspection, with process controls applied at key manufacturing stages.

PCB Assembly

SMT placement and wave soldering support electronic component assembly and PCB production.

01

Module Assembly

Dedicated assembly lines support the assembly of charging and power conversion modules according to the applicable product configuration.

02

Complete-Unit Assembly

Electronic, power and mechanical components are integrated into finished units according to defined product specifications.

03

Production Verification

Electrical and functional checks are carried out during production to verify applicable product requirements before units proceed to final inspection.

04

Final Inspection

Finished units are inspected according to applicable product and production requirements before shipment.

05

 

Incoming Material & Process Control
 

Quality control begins before components enter production.

 

Key electronic components, including MOSFETs, IGBTs, ICs and capacitors, are sourced from qualified or approved brands. Incoming batches are subject to IQC inspection before materials are released for production.

 

Process controls are applied during assembly and production testing according to the applicable product requirements.

 

Key control stages include:

  • Incoming material inspection
  • PCB and electronic assembly
  • Module assembly
  • Complete-unit assembly
  • Production testing
  • Aging and load testing
  • Final inspection

 

Testing, Aging & Final Verification

 

Finished products undergo testing and verification before shipment.

Electrical & Functional Testing

The factory is equipped with 11 testing stations supporting electrical and functional testing across different power electronics products.
Testing may include verification of electrical performance, operating functions and product-specific parameters according to the applicable requirements.

Aging & Load Testing

The factory has 8 aging racks and dedicated load equipment for testing applicable products under defined operating and load conditions.
These tests form part of the production verification process before final inspection.

Final Verification

After production testing and aging, finished units undergo final inspection.
Inspection activities may cover:

  • Product configuration
  • Electrical functions
  • Connections
  • Appearance
  • Other applicable product requirements

Quality records and inspection procedures are managed according to the requirements applicable to the product and project.

 

Compliance & Quality Documentation

 

Product and manufacturing requirements are reviewed according to the applicable product, target market and project specifications.

Current certification and compliance documentation includes:

  • CE / EU Compliance - LVD & EMC
  • CE Certificate of Conformity - EMC & LVD
  • IIW ISO 3834-2 Welding Quality Certification

Relevant quality and technical documentation may include:

  • Product specifications
  • Inspection records
  • Test records
  • Technical drawings
  • Operating instructions
  • Compliance documentation

Applicable certificates and documentation can be provided for review according to product and project requirements.

 

 

Discuss Your Manufacturing Requirements
 

Need to review manufacturing, testing or quality requirements for a battery charger or power electronics project?

Contact our team to discuss the applicable production capabilities, verification requirements and technical documentation for your project.

page-587-611

page-1008-756